To provide and install approximately 1,800 lineal feet of chain link fencing for future development at the City Airport located at 11499 Conner Street, Detroit
To provide for the development, engineering, and construction for immediate priority structural repairs at the Ford Underground Parking Garage.
The City desires to fully reconstruct Coolidge Terminal so as to restore its public transit vehicle storage, maintenance, and operations activities.
Contractor to provide design, engineering, construction, electrical, mechanical and renovation, of the East Side Transfer Station located at 5700 Russell Street, Detroit, MI.
The Contractor for the removal of asbestos containing materials and other abatement related services at the new Bus Operations and Maintenance facility at the Coolidge
Contractor to perform construction services for the following three (3) new parking lots at 6920 Rutland Street, 4899 Grayton Street, 3351 Sturtevant Street and 3359